Sunday, 23 July 2017

Lab Build: Painting - 10/07/17


After a long period of inactivity, the lab build is back underway and construction continues as we create my new lab.

Recently we spent 2 whole days painting the newly plastered walls brilliant matt white to reflect and reinforce the clinical and futuristic laboratory nature of the building. The first step in this process was to line areas with masking tape that need not be painted like the windows and then go around the outline of all the walls with a small paint brush. We then mixed a wet coat to be painted first, this consisted of a paint mix of about 30% water. This was necessary as to allow the paint to properly soak into the plaster creating a strong surface for the next coat.

We then took to the rollers and gave all 4 walls and ceiling 3 coats of paint. In between coats, we also painted the skirting boards gloss white, these required more coats and took much longer to dry and so took the week to complete. The only painting that remains now is the floor which is the easiest part to do.

As well as this, we used shovels and pick axes to dig up a trench where the armored cables and water pipe will be buried. Unfortunately, it rained for most of the time we were digging causing the trench to fill up with water and turn into a canal. It wasn't fun work and brought back bad memories of moving the soil in the rain but it didn't take too long.

Tomorrow the electrician is coming over to start the next phase of installing the electrics.








The glossy skirting boards currently residing inside the house to give room inside the lab for the electrician.



The official Halfcorp canal open for business!





Also, a pair of hanging baskets have appeared.


Monday, 1 May 2017

Lab Build: Construction Is Complete - 30/04/17

The day has finally arrived, the builders have packed up their belongings and left which means only one thing, the lab is done.

Ok, so its not actually done, there still lots of work ahead of us but structurally, the builders have completed their job. We now have a big empty room ready to paint and fill with experiments!

Last week the the plasterboard's were fully plastered and the areas around the door and windows were finished off. Once the plaster dried out, the skirting board was fitted finishing off the seal between the room and the outside world. They also relaid the concrete around the bottom of the door as that part was not properly smoothed out when the floor was poured a few weeks ago. They then moved all of their equipment out and swept up all the construction dust/mess that was present. The top of the drain was also covered back over with dirt and all remaining soil was moved to the skip.

A milestone has certainly been reached this week. Expect more updateds in the coming weeks regarding how we start the moving in process for my new lab!













And there's still plenty of space round the back for extra storage.


Tuesday, 25 April 2017

Einstein's Blackboard

In a recent visit to Oxford, we went to the small but FOC history of science museum open there. We saw all the usual archaic instruments used for research throughout the years from telescopes and planetariums for astronomy to Leyden jars and electroscopes for physics. But the most famous exhibit available was a black board hung on the wall. On it was a differential equation describing the expansion and density of the universe over time. What made the black board so special though is that the text on it was hand written by Albert Einstein himself in 1931. Someone decided to keep and preserve the board all this time. I find it pretty awesome to say that I have seen the original work of one of my idols in real life.



Sunday, 23 April 2017

Old Time Movies

As I'm sure you're all aware by now I'm always on the look out for new items and trinkets to add to my inventory of "stuff"; my latest acquisition is a vintage Elmo 8mm reel to reel movie projector. This and a series of silent movies were sourced from my grandparents old house in a recent clear out and so I decided to take it home. I'm not much of a geek for old tech but I did want to see if I could get it running.

Luckily the thing still worked without a hint of a problem which is quite a surprise considering how old it is. I even learnt a thing or two about how reel to reel works and how to load a film (as this wasn't one of those fancy automatic threading projectors). 

Sorry for the poor quality photos, my camera doesn't quite seem to like the dark...


Observant viewers will notice I don't have a take up reel so I'm using 2 CD's from my old failed Wimshurst machine to act as one instead.









Saturday, 22 April 2017

Lab Build: Windows + Doors, Plaster Board, Roof Insulation And Drainage - 22/04/17

In the short space of time since last update and now, a tremendous amount of work has been done and I'm happy to say the building is very close to completion! 

This week the majority of the time was spent putting the plaster board over all of the bricks to create the actual walls you will see when the room is finished. During this time, insulation was pushed up into the roof cavity and then covered over with more plaster boards. This created a proper boarder between all 4 walls and the floor making the concrete brick structure look much more like a fully fledged lab.

Today, more builders were called in to work double shifts to ensure that the schedule was being adhered to. The windows and door frames arrived as well as the glass and they were all installed today. A meter deep hole was dug and filled nearly to  the top with gravel. A plastic tube was then ran in a ditch from the base of the gutter into the hole which created a drain away from the building which was then shortly covered back over with soil.

For the first time, I was able to enter my lab through the glass double doors, shut them and get a proper feel for how self contained the room was now that it was completely sealed off from the elements and any wildlife that were trying to make a home in there. The insulation is certainly doing its job, I went in there at night when it was cool outside to find the lab at a comfortable room temperature despite no heating device in there at all.

Now that I'm able to lock up the doors to my lab it really accentuates the fact that construction is drawing to a close. Next week the plaster board will be skimmed and the final windowsill's will be installed. After that the builders will leave and we will paint the walls, ceiling and floor. Then the fun task of moving in can begin.