Lab Build: Day 1 - 16/03/17



Work commenced early Thursday morning, I was out for a few hours and was surprised with the work that had been done in such a short space of time when I returned. The tree in the middle of the site was cut down, the shed was torn apart and its concrete base was being jack hammered away. The skip arrived then the digging of the footings started.






In an effort to cut costs, it was agreed that the builders would leave the excavated soil in the garden and it would be upon me and my friends to transport it all to the skip out the front. This sounded fine in theory but not when we saw just how much we had to move.



That isn't even half of the footings dug. Looks like there's a LOT of work ahead of us.